Short construction time and precise assembly thanks to prefabrication

The wooden structure of our halls is designed for maximum stability and durability. Thanks to highly precise production and a high degree of prefabrication, the wooden structure can be installed on the construction site in a very short time. All components are numbered, presorted, and packaged into assembly groups.

We ensure that all parts with wood connections, rod dowels, fitting bolts, wood screws or internal steel parts are pre-assembled to save time on the construction site. Additionally, the entire wooden structure is treated with a water-based varnish to protect it against staining and discoloration during transport or assembly.

Our modular components are made of dried and planed glulam. The latter not only offers easy processability and high load-bearing capacity, but is also fully recyclable and therefore suitable for sustainable construction.

Advantages of our wooden structure:
  • short construction time due to a high degree of prefabrication
  • stability and durability
  • sustainable construction with spruce glulam from certified forestry
Fachwerkbinder aus Holz
Pre-assembled roof trusses
Vormontierte Rahmenecke
Pre-assembled frame corner
Bohrbild
Clean assembly thanks to tear-free, double-sided rod dowel and fitting bolts holes (these are countersunk again)